---
sku: SC20BS
name: FHC Roll Formed Cap Rail 2\" Square - Brushed Stainless
product_group: railing
d3_group: 04
d3_class: 4B
url_key: sc20bs
url: "https://fhc-usa.com/sc20bs"
image: "https://fhc-usa.com/media/catalog/product/s/c/sc20bs-1w_1_1.jpg"
variants:
  -
    sku: SC20BS
    label: Base
  -
    sku: SC20BS10
    suffix: 10
    type: length
    label: Length 10
  -
    sku: SC20BSC
    suffix: C
    type: custom
    label: Custom
catalog_refs:
  -
    catalog: FGR26
    pages:
      - "60"
co_page_skus:
  - "LT32629"
  - "LT7649"
  - "SC15"
  - "SC15BS"
  - "SC15H"
  - "SC15H3"
  - "SC15PS"
  - "SC20"
  - "SC20H"
  - "SC20H3"
  - "SC20PS"
operational:
  lead_time_days: 160
  uom: EA
  cuttable: false
  backorder: true
  make_buy: Buy
related_skus:
  - "CRV3RL"
  - "CRV4RL"
  - "SC20CSS"
  - "SC20EC"
  - "SC20H3"
  - "SC20H"
  - "SC20WC"
  - "SC20SK"
generated_at: "2026-05-21T23:29:40Z"
---

# FHC Roll Formed Cap Rail 2" Square - Brushed Stainless

The FHC Roll Formed Cap Rail 2" Square - Brushed Stainless is part of FHC's railing hardware line. Available in 1 lengths/sizes. Custom variants available. Featured in our Architectural Railing Systems (2026) (page 60).

## Description

Maintenance Stainless steel is a durable and corrosion-resistant material, but can still stain or rust if exposed to certain environmental conditions. Proper maintenance, including regular cleaning and protection is necessary to prevent staining and ensure the longevity of your stainless steel product. Products like FHC’s BSR1 Restoration Kit and CS77P Cleaning and Passivation Spray can aid in keeping stainless steel products’ factory finish. The user is responsible for maintaining stainless steel and any staining, rust or corrosion that occurs due to lack of maintenance is not the responsibility of the manufacturer.

## Available Variants

| SKU | Variant | Type |
|-----|---------|------|
| SC20BS | Base | base |
| SC20BS10 | Length 10 | length |
| SC20BSC | Custom | custom |

## Featured in Catalogs

- **FGR26** (Architectural Railing Systems (2026)): page 60

## Product Details

- Lead time: 160 days
- Unit of measure: EA

## Related Products in Catalog

Often shown alongside this product:
`LT32629`, `LT7649`, `SC15`, `SC15BS`, `SC15H`, `SC15H3`, `SC15PS`, `SC20`, `SC20H`, `SC20H3`, `SC20PS`
